BM500 · Installation

Install BM500 yourself, in about 15 minutes.

BM500 is made for boat owners, RVers and off-grid users who want a battery monitor without a technician. Follow these six steps, then check the live reading against a clamp meter before you rely on the numbers.

BM500Anegine · Battery monitoranegine@163.com

Before you start

Switch off every charging source and load, then disconnect the battery negative first. Use cables, fuses and lugs sized for your current, and torque each terminal to the value in the BM500 manual. If you are not confident working with 12/24 V DC, have a qualified marine electrician install it.

Installation

Wiring at a glance

Every charge source and load must connect to the system side of the shunt — never directly to the battery negative.

BATTERY1BM5002LOAD3CHARGE4BT5TEMP6
  1. 1Battery bank
  2. 2BM500 shunt
  3. 3Loads / inverter
  4. 4Charger / solar
  5. 5BM500 app
  6. 6Temperature sensor
Installation

Six steps, start to finish.

  1. 01

    Mount the shunt

    Find a dry, ventilated place close to the battery negative terminal. Mount the shunt securely so the cables cannot pull on the terminals.

  2. 02

    Connect the battery negative

    Run a cable from the battery negative to the battery-side terminal of the shunt. Nothing else should connect to that terminal.

  3. 03

    Connect loads and chargers

    Connect the system-side terminal to the negative busbar that feeds every load, charger, solar controller and inverter. This is what lets BM500 count all current in and out.

  4. 04

    Fit the temperature sensor

    If your kit includes the optional sensor, plug it into the BM500 sensor port and attach the probe to the battery case or negative terminal. Temperature support depends on the hardware revision.

  5. 05

    Pair over Bluetooth

    Power the BM500, open the app and tap Add Device. Allow Bluetooth — Android 12 and earlier also need location permission to scan. Select your BM500.

  6. 06

    Set capacity and calibrate SOC

    Choose LiFePO4 or lead-acid, enter the rated capacity (Ah), nominal voltage and full-charge voltage. For the most accurate SOC, start from a fully charged bank or enter the current SOC.

Installation

After wiring: a 60-second check

  • With no loads or charging, current should read close to 0 A.
  • Turn on a known load: current should be negative and power positive.
  • Charge the bank: current should be positive.
  • If the sign is reversed, a cable is on the wrong side of the shunt.
  • Compare the app reading with a clamp meter before trusting SOC.

Need a hand?

Send us a photo of your wiring and the app's diagnostic log. We usually reply within 1–2 business days.